Incidents and resources at the plant
Locations and resources appear on the map; positions depend on integrated telemetry.
Plant leaks and flooding. The operator logs the area and dispatches a crew.
The site plan is on paper, the report in the alarm system and the situation on radio. At handover, isolation records, photos and decisions need to remain accessible.
R$ 5.3 million
fine
Water and soil pollution after an industrial styrene leak in Manaus in July 2026.
Prefeitura de Manaus ·
AboutR$ 16 million
in material losses
Initial estimate for the furniture manufacturing hub in Ubá, Minas Gerais, after heavy rain in February 2026.
FIEMG ·
The Ignio platform brings facility reports and internal brigade updates together. The coordinator records decisions and external support dispatches on a timeline with an author and time.
An integrated view of the situation and resources supports coordination. The operator makes the decisions.
Locations and resources appear on the map; positions depend on integrated telemetry.
Authorized systems can open incidents through the API, alongside crew reports.
Photos, notes and status changes keep an author and time.
Connected incidents, geographic information and resources to follow the response with traceability.
When the alarm sounds, everyone sees the same incident.